This is a carousel with tiles that activate property listing cards. Use the previous and next buttons to navigate.
1/1
$260,000
This is a carousel with tiles that activate property listing cards. Use the previous and next buttons to navigate.
1/1
Property Description
Coastal Convenience Meets Comfortable Living Welcome home to this well-maintained 3-bedroom, 2-bath townhouse ideally located just 10 minutes from Carolina Beach. Offering an attractive price point for first-time homebuyers, small families, or those looking to enjoy the coastal lifestyle, this home combines comfort, value, and convenience. The desirable floor plan features a first-floor primary bedroom, providing easy everyday living. Recent updates include a newer roof installed in 2019 and a fresh professional paint job, giving the home a clean, move-in-ready feel. Enjoy outdoor living on the private fenced patio, with peaceful greenspace behind the property for added privacy and a relaxing view. Storage is abundant with a spacious walk-in attic and additional storage throughout the home. Residents also enjoy access to a community pool, while the property benefits from ample parking, making it easy to accommodate multiple vehicles and guests. Conveniently located near beaches, shopping, dining, and local attractions, this property presents an excellent opportunity to own an affordable home in a sought-after coastal area. Whether you're purchasing your first home, downsizing, or investing in a coastal retreat, this charming townhouse is ready to welcome you home.
Full Property Details
Full Property Details for 6028 Gantts Trail
General
- Sold For: $260,000
- HOA FEE: $198/month
- HOA FEE FREQ.: Annually
- Taxes: $1,053 (2026)
- Status: Closed
- Type: Townhouse
- Source: 2253
- MLS ID: 100584584
- Added to Site: 152 day(s) ago
Interior
- Number of Rooms: 6
- Interior Features: Master Downstairs, Ceiling Fan(s), Pantry, Blinds/Shades
- Appliances: Electric Oven, Built-In Microwave, Freezer, Washer, Refrigerator, Dryer, Disposal, Dishwasher, Electric Range
- Furnishings: Unfurnished
- Flooring: Carpet, Vinyl, Wood
Rooms
Bathrooms
- Total Bathrooms: 2
- Full Bathrooms: 2
Bedrooms
- Total Bedrooms: 3
- Primary Bedroom: Primary Living Area
Other Rooms
- Laundry: Dryer Hookup, Washer Hookup
Additional Information
- Shared Amenities: Community Pool, Maintenance Common Areas, Maintenance Grounds, Maintenance Structure, Management, Pest Control, Termite Bond
- Pool: Yes
- Pool Description: See Remarks
Exterior
- Exterior Features: Irrigation System
- Porch/Patio/Deck: Patio
Parking
- Garage: Yes
- Attached garage: Yes
- Garage Spaces: 2
- Parking Features: Garage Faces Front, Additional Parking, Gravel, Lighted, On Site, Paved, Garage
Location
- County: New Hanover
- Subdivision: Winds Ridge
- Driving Directions: S. College Rd south to Carolina Beach Rd. U-turn at Golden Rd. Right into Winds Ridge. Follow to Gantts Trail. Home located at 6028 Gantts Trail.
School Information
- High School District: New Hanover
- Elementary School: Anderson
- Middle School: Murray
- High School: Ashley
Community
- Association: Yes
- Assoc. Name: CAMS
- Pets Allowed: Yes
Heating & Cooling
- Air Conditioning: Yes
- Cooling Type: Central Air
- Heating Type: Electric, Forced Air, Heat Pump
Utilities
- Sewer: Municipal Sewer, City/Town
- Water: Public
- Utility Description: Cable Available, Sewer Available, Water Available, Fixed Wireless High Speed
Structural Information
- Property Detached: Yes
- Structure Type: Townhouse, Wood Frame, Stick Built
- Construction: Brick Veneer, Vinyl Siding, Wood Frame
- Basement Desc.: None
- Roof: Architectural Shingle
- Windows: Thermal Windows
- Entry Floor Number: 1
- Square Feet: 1,301
- Year Built: 2003
- Property Condition: Completed
Lot Features
- Lot Size (Acres): 0.08
- Lot Size (Sq. Ft.): 3,485
- Lot Dimensions: 37 x 100 townhome
- Frontage: Paved, Paved
- Zoning: R-15
- Fencing (Description): Back Yard
Green Features
- Building Certification: None
Financial Considerations
- For Sale: Yes
- Price Per Sq. Ft.: $205.61
- Association Fee: $2,376
- Assoc Fee Freq.: Annually
- Assessment Amount: $278,300
- Tax Amount: $1,053.37
- Tax Year: 2026
- Terms: Cash, Conventional, FHA, VA Loan
Disclosures and Reports
- Special Conditions: Standard
- Legal Description: Lot 12 Sec 1 Winds Ridge
- Property ID: R07900-003-121-000
Listed and Sold by Carolina Retreats Vacations LLC, Nathan A Pelsh
Get Pre-Approved Today
Schools
Schools serving 6028 Gantts Trail
School District:New Hanover County Schools
| Name | Grades | Distance |
|---|---|---|
Heyward C Bellamy Elementary 70 Sanders Road, Wilmington, NC 28412 | K-5 | 1.2 mi |
Charles P Murray Middle 655 Halyburton Memorial Parkway, Wilmington, NC 28412 | 6-8 | 0.9 mi |
Eugene Ashley High 555 Halyburton Memorial Parkway, Wilmington, NC 28412 | 9-12 | 1 mi |
Disclaimer:
School attendance boundaries provided by ATTOM Data Solutions and are for reference only. Contact the school directly to verify enrollment eligibility.
Price & Sales History for 6028 Gantts Trail
Date
Details
Price
Change
Source
11/05/2026
Sold
$260,000
-2.8%
MLS
9/14/2026
Price Reduced
$267,500
-4.46%
MLS
7/16/2026
Price Reduced
$280,000
-3.45%
MLS
7/02/2026
Price Reduced
$290,000
-3.33%
MLS
6/26/2026
Listed
$300,000
—
MLS
Disclaimer: Historical sales information is derived from public records provided by the county offices. Information is not guaranteed and should be independently verified.
6028 Gantts Trail, Wilmington, NC 28409 (MLS# 100584584) is a Townhouse property that was sold at $260,000 on November 05, 2026. Want to learn more about 6028 Gantts Trail? Do you have questions about finding other Townhouse real estate for sale in Wilmington? You can browse all Wilmington real estate or contact a Coldwell Banker agent to request more information.
